Newfoundland Service Alliance


Go to Flash Site.

horizontal-bar.jpg (1430 bytes)
vertical-bar.jpg (1182 bytes)

Ultramar Canada Ltd.

  • Bunker Line, Stephenville, NF
  • Loading Rack - Army Dock
  • Refinery Turnaround, Holyrood, NF
  • Oil Terminal, St. Albans, NF
  • Lube Oil Facility, Come By Chance, NF
  • Tank Dismantling, Stephenville, NF
  • Piping Modifications, Goose Bay, Labrador
  • Loading Rack, Twillingate, Glovertown, NF
  • Dye Injection System - Army Dock
  • Piping Modifications, Port Aux Basques, NF
  • Bulk Plant, Lethbridge, NF
  • Mechanical - Stephenville Terminal Station, Stephenville, NF
  • Plant Modifications, Hawkes Bay, NF
  • Piping Modifications, Pleasantville, NF
  • Pumps at Army Dock
  • Furnace Oil Tank, Pleasantville, Nf
  • Asphalt Plant, St. Barbe, NF
  • Removing Stack - Refinery
  • Repairs to No. 1 Boiler
  • Install 6" Valve and Manway Covers, Fort Pepperel, NF
  • Tank Piping, Clarenville, NF
  • Tank Farm Installation, Old Perlican, NF
  • Re-Vamp Skimmer Panel, Holyrood, NF
  • Install Valves and Loading Rack, Goose Bay, Labrador
  • Relocation of Oil Lines - W.C.B. Building
  • Spill Preventer, Port Aux Basques, NF
  • Plant Modification, Bonavista, NF
  • Bulk Plant Modifications, Wesleyville, NF
  • Tanker Repairs
  • Bulk Plant Modifications, Port Aux Basques, NF
  • Pipe Modifications - Army Dock
  • Pumps and Piping, Deer Lake, NF
  • Piping, Golden Falcon
  • Loading Rack Modifications, St. Anthony, NF
  • Pier 17 Pipe Supports
  • Bulk Plant Modifications, St. Barbe, NF
  • Relief Valve Installation, Twillingate, NF
  • 3" Offloading Line - Army Dock
  • Separator Modifications
  • Piping on Tank 524
  • By Pass on Dock, Holyrood, NF
  • Bottom Repairs on Tank 528
  • Asphalt Piping and Related Sork, St. Barbe Terminal
  • Install 3 Pumps and Piping, Clarenville, NF
  • Crude Bottom Unit Modifications, Holyrood, NF
  • Bunker Tank Modifications
  • Repairs to Aluminum Tanker
  • 3" Offloading Valves, Marystown, NF
  • Plant Modifications, Fortune, NF
  • Tank Bottom Replacement, Holyrood, NF
  • Install Loading Arm, Pleasantville, NF
  • 6" Fuel Line from Pier 17 to Pier 14
  • DOT Building, Southside, St. John's, NF
  • Piping Modifications, Harbour Grace, NF
  • Piping, Old Perlican, Nf
  • Piping Tank, Pleasantville, NF