- Units 14 and 15
- Emergency Firewater Line
- Effluent Treatment Plant
- Piping
- Hydrogen Storage Facilities
- Pump and Boiler Enclosures
- Maintenance NRC
- Naptha Line
- PRC Maintenance Rack No. 1
- Steam Tracing PRC
- CBC Impounding Basin
|
- Slop to Crude Tank PRC
- Water Pump on Jetty
- Hydrogen Reformer Heater PRC
- Methanator Piping Revisions
- Fire Monitor for H(2) Storage
- Pump at Flare Knockout Drum CBC
- Isolation Sulphur Storage Tank
- Sulphur Plant Fuel Gas Knockout Drum
- Sulphur Dgrassing System
- PRC Turnaround
|